COMPANY:
WORK:
CLIENT:
DATE:
FINALIZED
Guillermo Ibargoyen executed the second phase of the latest refurbishment, which include: alteration of the premises, accesses and communications; reduction of the seating capacity; new layout, affecting the offices and the uses of the theatre's different parts; renovation of roofs and terraces; repair and cleaning of façades; alteration of the stage, flooring and decorations; and refurbishment of the theatre's pictorial features.&

The building, with a total built area of 23,456 m2, is situated in San Sebastian's hospital district. It sets out to be an "advenced, pioneering" centre in the fight against cancer.

 

The works consisted in the construction of  117 single-family dwellings, in the following models: detached, semi-detached, quadruple and terraced houses.

The work consisted of building 210 homes, together with their storage rooms, garages and porches, distributed between 8 external entrances.

 

Located on a 46,000 m2 site, Guggenheim Bilbao Museum, with its 2,000 m2 of total surface area, is part of the collection of actions with the intention of achieving new roads for expansion and development in view of the progressive disappearance of a large part of the industrial activity.

 

  
NEWS
Copyright © 2008 BALZOLA S.A. | Privacy | Terms of use   Area member