COMPANY:
WORK:
CLIENT:
DATE:
FINALIZED

     

VITORIA TRAMWAY, 1ª PHASE, ABETXUKO BRANCH CLIENT GOBIERNO VASCO BUDGET 10.007.196 € FACULTATIVE DIRECTION Txema Izquierdo (E.T.S) PERIOD OF EXECUTION January 2008 - February 2009 ESTADO Finalizada LOCATION Vitoria,Álava
DESCRIPTION

Balzola executed the civil engineering works, the laying of the double track and the erection of the posts for the overhead power lines. Between América Square and the Abetxuko district, the tramway has five stops, with side (as opposed to central) platforms on this stretch.

The work consisted of preparing the six-metre-wide tramway platform for a double line; doing town planning work on the platform and adjacent areas; laying the tracks; and erecting the posts for the overhead power lines.

Two types of track were laid:

  • In areas used exclusively by the tramway: track with UIC 54 rail mounted on EDILON blocks. The track bed is covered with a grass lawn.
  • In areas of shared use: track with UIC 54 rail with SEDRA check-rail and rail-bedding system. The track bed is covered with pattern-imprinted concrete or agglomerate. At Abetxuko bridge the rail is of the RI60 type.

The stops have on each platform a shelter done in stainless steel and glass. They are furnished with benches, railings and the technical block, which houses the installations and equipment associated with the functioning of the stop.

 

P101009972
Foto 1
Foto 2
Foto 3
Foto 4
Foto 5
Foto 6
Foto 7
Copyright © 2008 BALZOLA S.A. | Privacy | Terms of use   Area member