VITORIA TRAMWAY, 1ª PHASE, LAKUA BRANCH CLIENT GOBIERNO VASCO BUDGET 10.177.016 € FACULTATIVE DIRECTION Txema Izquierdo (E.T.S) PERIOD OF EXECUTION September 2007 - December 2008 ESTADO Finalizada LOCATION Vitoria,Álava
DESCRIPTION

Balzola executed the civil engineering works, the laying of the double track and the erection of the posts for the overhead power lines on the 2,183 m. of the Lakua branch, between Ibaiondo and América Square. The tramway runs along Landaverde and Duque Wellington streets and Euskalerría Boulevard, in the Lakua district, and has six stops.

The work consisted of preparing the six-metre-wide tramway platform for a double line; doing town planning work on the platform and adjacent areas; laying the trancks; and erecting the posts for the overhead power lines.

Two types of track were laid:

  • In areas used exclusively by the tramway: track with UIC 54 rail mounted on EDILON blocks. The track bed is covered with a grass lawn.
  • In areas of shared use: track with RI60 rail and SEDRA rail-bedding system. The track bed is covered with pattern-imprinted concrete or agglomerate.

The stops are of two types: with a single platform or central platform. They are designed with people with reduced mobility in mind. They have a shelter on each platform with an integral technical block, with the ticket and travel pass vending machine, the device that cancels tickets and travel passes, and other elements necessary for the running of the line.

 