COMPANY:
WORK:
CLIENT:
DATE:
FINALIZED

The Ballonti Route is the alternative to the A-8 for mobility and accessibility  amongst the municipalities of the Left Bank. It takes much of the traffic that would otherwise use the N-634 road and the A-8 motorway on the one hand, and the estuary road (BI-3739) on the other. The El Carmen-Galindo stretch runs through the municipality of Sestao.

 

The project consisted of excavating a 230 m. - long tunnel. 12.850 m3 was excavated by tunnelling and 18.900 m3 by trench excavation.

 

The Artxanda Tunnels are a varied road system with three routes forming a triangle. Two of them, La Salve-Txorierri and Ugasko-Txorierri (toll fee) join the centre of Bilbao to Dual carriageway BI-637 (Txorierri corridor) speeding up access to the airport of Bilbao and the municipal districts on the right hand bank of the Nervión River. The third, Ugasko-La Salve, is a by-pass to the city of Bilbao between the quarters of Begoñ

The construction of this road facilitates the connection of the roads N-634 and BI-632 and reduces traffic on roads BI-3333 and BI-3323 and in the town of Durango caused by vehicles using the Iurreta-Kanpazar-Gipuzkoa route through BI-632.

 

The work consists in the construction of a new road parallel to the existing one between the links of Padura and Aranguren, 5,800 m. long, over the partially executed excavations with the first road to convert it into a Dual carriageway. In addition, the Aranguren link is remodelled to adapt it to the situation of double road and the links of Padura, Artxube and southern to Zalla are made.

 

  
Copyright © 2008 BALZOLA S.A. | Privacy | Terms of use   Area member