224 homes in Landaida
Client:
Budget:
Project management:
Execution period:
Status:
Location:
Inmogroup
22,310,119 €   
José María Smith Soláun  
May 1999 - February 2002  
Completed
Berango, (Vizcaya)

Description

The work consisted in the urbanisation of 4 plots that are along the existing streets and surround a large park and the construction of 10 blocks with 224 homes, of which 120 have 4 bedrooms and 104 have 3 bedrooms.

The buildings have a very sharp-angled roof with insulation sprayed onto the concrete and they have concrete pile foundations 65 cm diameter in H-200 concrete.
Legal Disclaimer | Contact | Copyright 2012 BALZOLA