Alterations to and extension of Zipiriñe primary school
Client:
Budget:
Project management:
Execution period:
Status:
Location:
Basque Government
3.878.907 €  
Arquitecto (Fernando Pérez Rodríguez-Urrutia) and Tech.Archit. (Javier Beascoechea y Joaquín Iturregui)
January 2008 - March 2009
Completed
Sopelana, Vizcaya

Description

The work consisted of constructing a new classroom building annexed to the existing one, with three floors together with a lower ground floor where the building services were installed centrally (all in one place), to achieve a total of 40 teaching units.

In addition, we built a new 30-metre indoor sports hall with laminated wooden beams; during this phase the gymnasium was also extended.

As for the alterations, part of the existing building was restructured for new uses.