Refurbishment and extension of the H10 Casa del Mar Hotel
Client:
Budget:
Work Management:
Execution Period:
Status:
Location:
Nazca Proyectos S.L.
€ 6.000.000
D. Tomeu Ferra Palazón, D. Gabriel Pérez y D.Gabriel L. Rechach
diciembre 2016 - mayo 2017
Finalizada
Santa Ponsa, (Calvia, Islas Baleares)

Description

The project consists in the demolition of half of the hotel and new construction of 81 rooms, as well as the renewal of the hallways to the rooms which have not been renovated.

The purpose of the project is to reform, expand and change the category of the hotel from 3* to 4*. To do this, as well as increasing the number of rooms from 212 to 245 (+33), the reception of the hotel has been completely renovated, as well as the restaurant and the pool on the ground floor. To this we must add the execution on the roof of an infinity pool with sea views.

For greater accessibility to the old part of the hotel a new elevator has been installed, as well as the refurbishment of 4 rooms adapted for disabled people.

It should be noted the installation of a panoramic elevator, as well as all the renovation of the solarium swimming pool on the ground floor which has been paved with Visendum flooring, which is the same as that used in the terraces of floors 3, 4 and roof.
Legal Disclaimer | Contact | Copyright 2012 BALZOLA