Ostroleka Railway line
Client:
Budget:
Project management:
Execution period:
Status:
Location:
PKP Polskie Linie Kolejowe S.A.
3,535,911 €
NDI - BALZOLA Consortium
July 2012 - November 2012
Completed
Tłuszcz, Ostrołęka (Poland)

Description

The work consists in the design and construction to modernise the single electrified railway line, adjusting the parameters so that trains can run at 120 km/h.

The track’s superstructure has been completely changed. The total length of the performance was 6.098 Km.

5 structures have been repaired which were underground passes for the drainage of the superstructure.

5 level crossings were modified.


Legal Disclaimer | Contact | Copyright 2012 BALZOLA