Widening of the San Lorentzo Univertsitatea section of the Bilbao-Donostia line
Client:
Budget:
Facultative direction:
Period of execution:
State:
Location:
Euskal Trenbide Sarea (ETS)
4,389,533.54 €  
ETS (José Luis Mancho Beato)
december 2008 - july 2010
Completed
Ermua/Eibar,Bilbao/Guipuzcoa

Description

The work consisted of constructing a double track between the San Lorentzo and University halts, on the Bilbao-Donostia line of Basque train operator Eusko Tren.

All the execution was planned in accordance with the need to keep the line open to railway traffic at all times.

The extension of the existing levelled area in order to lay the second track necessitated the widening of an existing flyover, and protection of the excavation in the cutting with mesh and bolts on one side and multiple retaining walls of micropiles anchored on the other.

The new tracks are composed of UIC54 rails and mono-block sleepers, also including the supply and erection of a type A switch and a type B crossover.