Znajdujesz się w > Referencje > Budownictwo > Hotel Ibis Madrid
Hotel Ibis Madrid
Client:
Budget:
Project management:
Execution period:
Status:
Location:
Torres Group
4,236,066 €
Javier Abásolo and PAU Arquitectos
October 2010 - September 2011
Completed
Madrid (Madrid)

Description

This is a complete renovation of quite an old building in the centre of Madrid, next to the Las Ventas bullring. The project includes the demolition of vertical faces and all of the building’s existing interiors, with a mixed structure, concrete up to the 3rd floor and metallic with ceramic bovedilla up to the 8th. While the work is carried out, there is an OPENCOR shop in one of the ground floor commercial premises which will remain open during its normal opening hours throughout the work.
Informacja Prawna | Kontakt | Copyright 2012 BALZOLA